Construction Update Photos June 13th
Saturday, June 13, 2009 |New addition floor slab installed.
With the slab installed, framing will begin on the walls.
................................
With the water line installed and the trench back filled the new shed has the gravel area graded and packed ready for the trash and recycle dumpsters to be moved in place.